CNCR project work focuses on understanding the technical problem, reducing uncertainty and helping manufacturers make better decisions about repair, replacement, retrofit or continued operation.

Machinery Support

High-Pressure Pump Replacement

Problem: A high-pressure pump assembly on waterjet equipment required replacement, with control-system changes needed to integrate the replacement pump and return the machine to production.

Work: The replacement pump assembly was valued at approximately $90,000. CNCR led the replacement project, completed the PLC, NC and EtherCAT configuration changes, coordinated the required wiring integration, and commissioned the replacement pump.

Outcome: Production resumed the day after the replacement pump arrived and commissioning was completed.

Failure Investigations

Independent Machinery Investigation

Problem: Failed industrial machinery required independent inspection to support repairability, replacement and settlement decisions.

Work: CNCR inspected, disassembled and technically assessed the failed machinery.

Outcome: Technical findings were documented to support commercial stakeholders’ decisions.

Reliability Engineering

CNC Condition Assessment

Problem: CNC machinery condition and maintenance risk required structured assessment to support maintenance planning.

Work: CNCR completed a structured inspection of the CNC machinery, control systems, auxiliary equipment and maintenance condition.

Outcome: Prioritised recommendations were provided for maintenance planning.

Every project should reduce uncertainty and support better technical decisions.